Circuit Crews

Electrical permits and inspections in Washington: who buys what

Nearly all electrical work in Washington needs a permit and an inspection. The rule on who buys the permit is short, and it protects you.

The basic rule

The Department of Labor & Industries puts it plainly: electrical work in Washington requires a permit and inspection, and the permit must be bought before the work starts. A small number of exceptions are listed in the state's electrical rules at WAC 296-46B-901.

Who buys the permit

The permit is bought by whoever will actually do the work: the electrical contractor, or the property owner if the owner is doing it. So when you hire a contractor, the contractor buys the permit. If a firm asks you to take out a homeowner permit for work its crew will do, stop and ask why.

Who inspects

For most of the state the answer is Labor & Industries. There are two exceptions. Some cities run their own electrical permit and inspection programs, and jobs in Tacoma Power's service area go through Tacoma Power. In those places you buy the permit and book the inspection with the city or with Tacoma Power instead of the state. The department keeps the current list of cities on its permits page.

What to ask your contractor

A licensed contractor will have ready answers. You can confirm the firm's license in a couple of minutes: see how to check a license.

Source: Washington State Department of Labor & Industries, Electrical permits, fees and inspections.